Add Material Lines on Repair Shop Order

Explanation

This activity is used to manually add material on a repair shop order created from the component repair order line. Manually added material will not be connected to any service type. If the requirement is to map the related material transactions with a service type, then this connection must be established manually.

Prerequisites

System Effects

As a result of this activity, a material line is added to the repair shop order, which is pegged to a component repair order.

Window

Component Repair Order
Shop Order

Related Window Descriptions

Shop Order/Material
Shop Order
Component Repair Order/CRO Lines/Repair Order
Component Repair Order/CRO Lines
Component Repair Order

Procedure

  1. Open the Component Repair Order window and search for an existing component repair order.
  2. Click the CRO Lines tab.
  3. Select a component repair order line released to repair with the repair order type Repair Shop Order.
  4. Click the Repair Order tab, right-click and then click Repair Shop Order. The Shop Order window opens.
  5. Click the Material tab.
  6. Create a new record and define required material data.
  7. Save.

Note: In the Service Type field you can connect the material line to a service type recorded for the component repair order line.