Use this window and its tabs to enter and revise shop orders.
For the description of each tab in the window, follow the appropriate link: Detail, Material, Operation, Operation Tools, Tracking and History, By-Product, By-Product Cost Distribution, Shop Order Splits, MRB, Lots/Batches, Multilevel Repair Structure, Salvage Part. Depending on which components you have installed, you may also see DOP Info, Material History and Control Plan.
For more information on splitting and merging shop orders, follow the links: Split Shop Order, Comprehensive Shop Order Split, Split Shop Order Checklist Maintenance, Merge Shop Order.
Note: If you are updating either the earliest start date or the need date on a shop order without operations, the change does not affect the start or finish dates. This could cause problems in DOP Alarm or other functionality in which checks are sometimes performed against the finish date.
For shop orders, only part ownership values of Company Owned and Customer Owned are allowed at the header level. Shop order material also allows Supplier Loaned part ownership.
If you are updating either the structure revision and/or alternative or the routing revision and/or alternative of a configured part, the details of the materials and the operations will be updated according to the latest revision you have created.
Create shop order
BDR for constraint based
scheduling
Handle shop order
Handle repair
shop order
Multilevel repair
Reserve components
Reserve and
issue components
Issue components
Report operations
Receive shop order
Material review
board
Perform quality inspection and handle discrepancies
Handle
inventory discrepancies
Handle multilevel repair shop order
Modify CRO work scope
Create shop order manually
Check material
Release outside operation
Release shop order
Update ESD
according to material availability
Specify priority rule on
shop order
Cancel shop order
Park shop order
Add work guideline to
shop order
Enter pre-posting, shop
order
Add shop order component
Add shop order operation
Add material
lines on repair shop order
Add operations on repair shop order
Add shop order by-product
Delete shop order component
Delete shop order operation
Remove
operations from repair shop order
Remove
material lines from repair shop order
Delete shop order by-product
Update structure revision and/or
alternative
Update routing revision and/or
alternative
Merge shop order into shop
order
Reserve serial numbers
Change scheduling direction
Change lot size
Change due date
Check existing reservations
Change shop order closure
Reserve shop order automatically
Reserve shop order components
automatically
Reserve shop order components
manually
Reserve operation linked material
Unreserve material
Schedule shop order
Use shop order report control
Print shop order pick list
Print shop order work instruction
Print shop
order work instruction with bar code number
Print barcode labels
Calculate order estimated cost
Save standard cost
Issue components manually
Issue components automatically
Issue
repair part and consumables RSO
Unissue material
Unissue all material
Report shop order operations
Report labor operation
Cancel operation and
scrap report
Cancel labor operation report
Ship WIP to supplier
Reverse WIP shipment
Receive automatically
Receive into inventory manually
Receive reserved serial
structure
Receive and backflush
components
Receive and backflush
operations
Receive and backflush
all
Receive
with simplified material check
Receive and
close shop order
Unreceive shop order
Open shop order
Plan shop order
Close shop order
Perform shop order
split
Create split checklist
Enter split reason
code
View configuration
Edit configuration
Create configuration
Create MRB case
Change shop order owner
Connect
shop order to project activity
Disconnect
shop order from project activity
Unpeg customer order line from supply order
Receive reserved lots
Scrap of components
Unreport component scrap
Comprehensive shop
order split
Create multilevel repair
shop order
Match lot/batch to
serial numbers and receive
Calculate and
cascade weighted average actual cost