Calculate Project Item Rollup Cost/Hours

Explanation

Perform this activity to calculate the rollup cost and hours for a project item in the project product structure.

Once you right-click and select the Calculate Cost and Hours menu option, the result will be stored in the Project Rollup field for the project item and all items in the product structure. The components of a standard planned item or a component of a PMRP or DOP item will not have cost or hours stored, as the component cost will not be rolled up to the Standard Rollup cost of their parent. Parent part will store the cost and hours of the complete sub assembly.

Cost and hours for Standard Level and Standard Rollup columns are retrieved according to the hierarchy described in the topic About Project Item Cost and Hours.

The cost and hours will also be updated to the Planned field of the connected activity with the relevant cost element.

Prerequisites

It is recommended that you perform cost calculations for inventory parts in IFS/Costing and doe Engineering parts in IFS/PDM before running the cost calculation in the delivery project.

System Effects

Calculation Rules

For the bottom level (parts with no sub-parts):

For all parts with sub-parts:

Window

Project Item

Related Window Descriptions

Project Item/Cost
Project Item/Hours

Procedure

  1. Select the project item for which you want to do a rollup cost and hours calculation.
  2. Right-click and then click Calculate Part Cost and Hours.