Calculate Project Item Rollup Cost/Hours
Explanation
Perform this activity to calculate the rollup cost and
hours for a
project item in the project product structure.
Once you right-click and select the
Calculate Cost and Hours menu option,
the result will be stored in the
Project
Rollup field for the project item and all items in the product structure.
The components of a standard planned item or a component of a PMRP or DOP item
will not have cost or hours stored, as the component cost will not be rolled up
to the Standard Rollup cost of their parent. Parent part will store the cost
and hours of the complete sub assembly.
Cost and hours for Standard Level and Standard Rollup columns are
retrieved according to the hierarchy described in the topic
About Project Item
Cost and Hours.
The cost and hours will also be updated to the Planned
field of the connected activity with the relevant cost element.
Prerequisites
-
The project item, with the exception for standard planned parts or parts
with supply option PMRP or DOP, must have a structure in the delivery
project.
- The currency code to the company's default site (defined in PDMCON_SITE in
Product
Basic Data/Defaults tab) must exist in the currency rate type
used for accounting in project. The project specific currency rate
type for accounting is defined in the
Project/Currency tab.
It is recommended that you perform cost calculations for inventory parts in
IFS/Costing and doe Engineering parts in IFS/PDM before
running the cost calculation in the delivery project.
System Effects
- The values are calculated for all levels in
the project product structure, starting from the bottom then upwards
to the top project item. The calculation updates
the Project Rollup
cost and hours for all items in the
structure.
Calculation Rules
- X1 = Standard Rollup Cost/Hours (from Costing or from PDM
adjusted to project currency code)
- X2 = Standard Level Cost/Hours (from Costing or from PDM adjusted to project currency code)
- X3 = Project Level Override Cost/Hours
- X4 = Project Override Cost/Hours
For the bottom level (parts with no sub-parts):
- Project Roll Up cost and hours are updated to the first existing
occurrence of X4, X3, X2, X1, 0 (zero).
For all parts with sub-parts:
- IF X4 has value
Project Roll Up = X4 (i.e. this will ignore all costs/hours on lower
levels)
- ELSE
IF it is a standard planned part or part with supply option PMRP or DOP
Project Roll Up = first existing occurrence of X3, X2, X1, 0 (zero)
ELSE
Project Roll Up = Sum of (Project Roll Up value for the child * quantity
of the child) for all sub items on the level below + first existing
occurrence of X3, X2, 0 (zero)
Window
Project Item
Related Window Descriptions
Project Item/Cost
Project Item/Hours
Procedure
- Select the project item for which you want to do a rollup cost
and hours calculation.
- Right-click and then click
Calculate Part Cost and
Hours.