Calculate Cumulative Lead Time
Explanation
Use this activity to calculate a parts cumulative
lead time. The cumulative lead time of a part is the total turnaround time for all parts
in the structure. You can calculate the cumulative lead time for a single part,
or all parts for the specified site.
Prerequisites
This activity has the following prerequisites:
- A part must have been defined with a routing.
System Effects
As a result of this activity:
- The system calculates the
cumulative lead time for a part or parts on a site,
- The system updates the cumulative lead time
field in the inventory part records.
Window
Cumulative Lead Time
Calculation
Related Window Descriptions
Cumulative Lead Time Calculation
Procedure
- In the Site field, select the site for which you want to run the calculation.
Click List button to select from available sites.
- If you want to calculate the cumulative lead time for a specific part, select the part
in the Part No field. Click List to select from available parts. If no
part is selected, the calculation is done for all parts at the site.
- Click OK.