Cumulative Lead Time Calculation
Usage
Use this dialog box to calculate the cumulative
lead time of a part or all parts.
- When calculating cumulative lead time for a
single part, it just looks one level down and accumulate lead time to top.
It does not consider the entire BOM structure.
- When calculating for all parts on a site it
starts with calculating low level code. Then it calculates cumulative lead
time for the parts on the lowest level. Then it continues with parts on
(lowest level - 1) etc. This always gives accurate result.
Specify whether you want to perform a calculation
for all parts at a site or for one part at a time. In either case, the lead time
calculation only uses the default '*' alternate. Only alternates in the Planned
or Buildable states are used.