Evaluate Result using CBS

Explanation

Use this feature to evaluate the results after rescheduling the operations.

Prerequisites

A site connected to a constraint based scheduler must exist.

System Effects

There are no system effects.

Window

Scheduling Client
Work Order Scheduling Client

Related Window Descriptions

Scheduling Client
Work Order Scheduling Client
Gantt Chart
Data Tree

Procedure

  1. Start the Scheduling Client or Work Order Scheduling Client dialog box and enter the site for which you want to evaluate the results in the Site field. Use List to select from available sites.
  2. Specify for how long you want to be able to use the scheduling client in the Time Limit field.
  3. Click OK. This action will start the scheduling client where you can study the results.