Evaluate Result using CBS
Explanation
Use this feature to evaluate the results after rescheduling the operations.
Prerequisites
A site connected to a constraint based scheduler must exist.
System Effects
There are no system effects.
Window
Scheduling Client
Work Order Scheduling Client
Related Window Descriptions
Scheduling Client
Work Order Scheduling
Client
Gantt Chart
Data Tree
Procedure
- Start the
Scheduling Client or
Work Order Scheduling Client dialog box and
enter the site for which you want to evaluate the results in the Site field. Use
List
to select from available sites.
- Specify for how long you want to be able to use the scheduling client in the
Time Limit
field.
- Click OK. This action will start the scheduling client where you can study the
results.