Reserve Operation-Linked Material
Explanation
Use this activity to reserve material linked to a specific operation. By
linking material to the operation where it is used, you avoid having to reserve
material too far in advance. This ensures that material is not locked up for an
unnecessarily lengthy period.
The supply code of the selected material lines is
considered when reserving material.
- If the supply code is Inventory Order, only
standard inventory is available to reserve.
- If the supply code is Project Inventory, only
project inventory belonging to the project connected to the shop order is
available to reserve. If possible, parts belonging to the connected project
activity are reserved.
Prerequisites
- This activity requires that a material line is linked to an operation. This is
displayed in the
Shop Order/Material tab.
- Enough unreserved material should be available at
stock
System Effects
As a result of this activity, the system reserves the material connected to an
operation.
When reserving a material line with a connected supply
pegging, the automatic reservation will reserve the quantity that is not pegged.
For shop orders connected to project activities the
system reserves according to following priority:
A. Project Inventory connected to the same activity.
- Issue From location identified for the shop order
component.
- Inbound locations for the identified Work Center
Location for the operation associated with the component, if any.
- From location type Floor Stock.
- From location type Picking.
B. If A was not fulfilled and supply code is Project
Delivery
- Try to reserve components from the demand activity
sequence using the project delivery structure.
C. If A or B was not fulfilled, look for Project
Inventory connected to a different activity, but belonging to the same project
- Issue From location identified for the shop order
component.
- Inbound locations for the identified Work Center
Location for the operation associated with the component, if any.
- From location type Floor Stock.
- From location type Picking
The system reserves according to a FIFO algorithm.
Window
Shop Order
Related Window Descriptions
Reserve Material for Operation
Shop Order
Shop Order/Operation
Procedure
Shop Order:
- Right-click to select Material Actions then click Reserve Operation Material.
- In the Operation No field, type the operation number for which to reserve material.
- Click OK.
Shop Order/Operation:
- In the
Operation tab, select the operation for which to
reserve material.
- Right-click and then click Reserve Operation Material.
- Click OK.