Reserve Shop Order Components Automatically

Explanation

Use this activity to reserve material for one or more selected material lines. This activity reserves all material for the lines that have not been reserved yet. 

The supply code of the selected material lines is considered when reserving material.

Prerequisites

System Effects

As a result of this activity, the system reserves material for a shop order. The shop order's status changes to Reserved. The status of the selected material line or lines also changes to Reserved.

When reserving a material line with a connected supply pegging, the automatic reservation will reserve the quantity that is not pegged.

For shop orders connected to project activities the system reserves according to following priority:

A. Project Inventory connected to the same activity.

  1. Issue From location identified for the shop order component.
  2. Inbound locations for the identified Work Center Location for the operation associated with the component, if any.
  3. From location type Floor Stock.
  4. From location type Picking.

B. If A was not fulfilled and supply code is Project Delivery

  1. Try to reserve components from the demand activity sequence using the project delivery structure.

C. If A or B was not fulfilled, look for Project Inventory connected to a different activity, but belonging to the same project

  1. Issue From location identified for the shop order component.
  2. Inbound locations for the identified Work Center Location for the operation associated with the component, if any.
  3. From location type Floor Stock.
  4. From location type Picking

The system reserves according to a FIFO algorithm.

Window

Shop Order

Related Window Descriptions

Shop Order/Material
Shop Order

Procedure

  1. In the Material tab, select one or more material lines for which you want to reserve material.
  2. Right-click and then click Reserve. A dialog box appears.
  3. At the prompt that asks if you want to reserve this row, click Yes.