Update Structure Revision and/or Alternative
Explanation
Use this activity to select a different revision and/or alternative of the structure for the shop order. (The current
revision is selected automatically when the system registers a shop order.)
Prerequisites
- This activity requires that the shop order is in state Planned or
Released.
- If a material line is manually pegged against a purchase order line or a shop order, the pegging has to be removed first.
System Effects
As a result of this activity,
- The system changes the revision and/or alternative used for the selected shop order.
- If the manufactured part is a configured part, the
Shop
Order/Material tab will be updated according to the latest revision.
Window
Shop Order
Shop Orders
Related Window Descriptions
Shop Order
Shop Orders
Update Structure Revision and/or Alternate
Procedure
- Right-click and then click Update Structure Revision and/or Alternative. The
Update
Structure Revision and/or Alternate dialog box appears.
- In Update Structure Revision and/or Alternate, select the desired structure revision and alternative combination in
the Revision field. Click List to select from available valid combinations.
- To change only the alternative, select the specific alternative in the Alternate
list.
- Click OK.