Evaluate Master Scheduling Level 1 Result using Period Template

Explanation

This activity is used to evaluate the result of the level 1 calculation, using a period template.

Prerequisites

This activity requires that the level 1 calculation of the selected part must have been performed.

System Effects

N/A

Window

MS Level 1 Part

Related Window Descriptions

MS Level 1 Part
MS Level 1 Part/View by Period
Select Period Template

Procedure

  1. From the Part No list, select the part for which you want to study the results.
  2. Click the View by Period tab to display the result of the level 1 calculation.