Create Standard Operation

Explanation

This activity is used to create standard operations. You can also use this activity to associate tools and work guidelines with standard operations.

For outside work center operations, you can either select the Outside Operation Backflush type or the Outside Operation Supply type.  The default value for the backflush option is obtained from the work center. If an outside operation item has not been entered for the outside operation, a message will appear. However, you have the option of creating a new outside operation item.

Prerequisites

A work center must be defined in the Work Center window. If you work with labor operations, labor classes must be defined in the Manufacturing Labor Class window.

System Effects

This action creates a new standard operation. This standard operation can now be used to create routing template operations and routing operations.

Window

Standard Operation
Standard Operations

Related Window Descriptions

Standard Operation
Routings
Routing Template
Manufacturing Standard Basic Data/Work Center Department
Manufacturing Labor Class
Create Outside Operation

Procedure

  1. Click New.
  2. Enter a standard operation description in the Operation Description field.
  3. Select the site in the Site field. Click List of Values to select from available sites. Only routings and routing templates for this site may use this standard operation.
  4. Select a work center for the operation in the Work Center No column. Click List of Values to select from available work centers.
  5. Specify machine time and/or labor time in the Mach Setup, Mach Factor, Labor Setup, and Labor Factor columns.
  6. Enter the unit of measure for the manufacturing time in the Factor Unit column.
  7. If specifying labor setup time, enter values in the Setup Labor Class No and Crew Size fields. Use the List of Values to select from available values.
  8. If specifying labor run-time, enter values in the Labor Class No and Crew Size fields. Use the List of Values to select from available values.
  9. If specifying an outside operation, select an outside operation item in the Outside Op Item column. Click List of Values to select from available parts. This part must be defined as a non-inventory purchase part.
  10. Select the Outside Operation Supply Type and Outside Op Backflush.
  11. Click Save (F12).
  12. If there is no outside operation item entered, Create Outside Op Item dialog box will be opened.
    Enter part number, description and price in Purchase Part No, Part Description and Price fields respectively.
  13. Select the Milestone Operation check box. This check box indicates that, the operation must be reported prior to the succeeding operations and that automatically reporting is not allowed.
    Note: Currency will get the default value from the supplier. U/M field will get the default value from unit of measure of the routing part. If supplier is related to the outside work center, it will also get the default value from the work center.

Add Work Guideline Records (Optional).

  1. Click New.
  2. Enter a guideline description. The guideline ID is automatically created.
  3. Enter a guideline text.
  4. (Optional) Right-click, then click Work Guideline Template.
  5. Click Save (F12).

Add Tool Records (Optional).

  1. Select the tool ID to connect with new tool instances in the Tool ID list box.
  2. Highlight the first empty line in the Standard Operation Tools tab and select New.
  3. Enter the tool sequence. This is the order in which the tool is used for this operation.
  4. Enter a tool ID in the Tool ID column. Click List of Values to select from available tool ids.
  5. Enter the number of tools required for this operation.
  6. Repeat steps 1-5 for each tool instance.
  7. Click Save (F12).