Create Standard Operation 
Explanation
This activity is used to create standard
operations. You can also use this activity to associate tools and work guidelines with
standard operations. 
For outside work center operations, you can either select the Outside 
Operation Backflush type or the Outside Operation Supply type.
 The default value for the backflush option is obtained from the work
center. If an outside operation item has not been entered for the outside operation, a
message will appear. However, you have the option of creating a new outside
operation item.
Prerequisites
A work center must be defined in the 
Work Center window. If you work with labor operations, labor classes
must be defined in the Manufacturing Labor Class
window. 
System Effects
This action creates a new standard
operation. This standard operation can now be used to create routing template operations
and routing operations. 
Window
Standard Operation
Standard Operations
Related Window Descriptions
Standard Operation
Routings
Routing Template
Manufacturing
Standard Basic Data/Work Center Department
Manufacturing Labor Class
Create
Outside Operation
Procedure
  - Click New.
- Enter a standard operation description in
    the  Operation Description  field. 
- Select the site in the  Site
     field. Click List
    of Values  to select from available sites. Only routings and routing
    templates for this site may use this standard operation.
- Select a work center for the operation in
    the  Work Center No  column. Click List of Values  to select from available work
    centers. 
- Specify machine time and/or labor time in
    the  Mach Setup, Mach Factor, Labor Setup,  and  Labor Factor  columns. 
- Enter the unit of measure for the
    manufacturing time in the  Factor Unit  column. 
-  If specifying labor setup time, enter values in the Setup Labor Class No and 
	Crew Size fields. Use the List of Values to select from available values. 
 
-  If specifying labor run-time, enter values in the Labor Class No and 
	Crew Size fields. Use the List of Values to select from available values. 
 
- If specifying an outside operation, select
    an outside operation item in the Outside Op Item column. Click List of Values
    to
    select from available parts. This part must be defined as a non-inventory purchase part.
- Select the Outside Operation
    Supply Type and Outside Op Backflush.
- Click Save (F12).
- If there is no outside operation item entered, 
	Create Outside Op Item dialog box will
    be opened.
 Enter part number, description and price in Purchase Part No, 
	Part
    Description and Price fields respectively.
- Select the Milestone Operation check box. This check box 
	indicates that, the operation must be reported prior to the succeeding 
	operations and that automatically reporting is not allowed.
 Note: Currency will get the default value from the supplier. 
	U/M
    field will get the default value from unit of measure of the routing part.
    If supplier is related to the outside work center, it will also get the
    default value from the work center.
Add Work Guideline Records (Optional). 
  - Click New.
- Enter a guideline description. The
    guideline ID is automatically created. 
- Enter a guideline text. 
- (Optional) Right-click, then click Work
    Guideline Template.
- Click Save (F12). 
Add Tool Records (Optional). 
  - Select the tool ID to connect with new tool
    instances in the  Tool ID  list box. 
- Highlight the first empty line in the 
	Standard
    Operation Tools tab and select New. 
- Enter the tool sequence. This is the order
    in which the tool is used for this operation.
- Enter a tool ID in the  Tool ID
     column. Click List
    of Values  to select from available tool ids.
- Enter the number of tools required for this
    operation.
- Repeat steps 1-5 for each tool instance. 
- Click Save (F12).