Define Production Unit
Explanation
Use this activity to define a production unit.
Generally, production units are defined in order to divide equipment in a
facility to smaller sections, e.g., production groups. This is to facilitate
better management and easy follow-up of production. During the creation of a
production unit you need to specify how the production unit is to be used by
selecting an appropriate follow up type:
- If you choose APQ, the production unit
will be used for analysis.
- If you choose Inactive, the production
unit will not be used for analysis.
- If you choose Overview, the production
unit will be used as an overview (umbrella) for other production units.
Prerequisites
N/A
System Effects
A new production unit is created in IFS/OEE.
Related Window Descriptions
Define Production Units
Setup OEE
Procedure
- Open the Setup OEE window.
- Click Define Production Units to open the
Define Production Units window.
- Create a new production unit in the window by
clicking Create New on the toolbar.
- In the Unit ID field, enter a unique ID
code for the new production unit.
- Enter a description for the new production unit
in the Description field.
- In the Follow up Type list, select how you
want the new production unit to be handled.
- To set a limitation to the number of equipment
objects that can be used when defining new events, enter a value in the
Group field. Use the List of Values to select a valid value. Note:
If you have selected the follow up type Overview, a value in this field is
required even though it is of no consequence.
- In the Nominal Runtime field, enter the
amount of hours per day that the production unit will be in operation.
Usually, this value is set to 24 hours.
- In the Unit of Measure field, enter the
unit of measure the production unit will use to produce equipment. Use the
List of Values to select a valid value.
- If the selected follow up type is APQ, you need to
enter the top object(s) for the production unit. Specify the top object(s)
you want in the Top Objects field. Use the List of Values to select a
valid value.
- If the selected follow up type is Overview, you
need to enter the production unit(s) you want connected to the new
production unit. Note: The production unit(s) which is to be
connected should have the follow up type APQ.
- Save the record.