Use this tab to add route standard jobs to the PM actions that are generated. The upper table contains the details related to the route standard jobs, whereas the lower table contains details related to the route PM actions. Furthermore, the simulation and generation of route PM actions are done on this tab as well.
Add Separate
and Route Standard Jobs 
Simulate PM Actions 
Generate Simulated PM Actions