Plan and Create Maintenance Order—Exercises
Main Exercise
Purpose: The purpose of this lesson is to show you how to
execute pending tasks. There are 3 optional methods of task execution:
Purpose: The purpose of this lesson is to handle tasks that
have been generated by interval maintenance, condition based maintenance and modification
pre-check.
Prerequisites: Before starting on this exercise you must
have finished the
Condition Monitoring 2 exercise.
Windows:
Task Distribution
- Open the Task Distribution window.
- Query for the top serial number nX20000.
- Click the Pending Tasks tab and verify that there are 4 pending
tasks (two with the Intervalmaint task type, one with the On-Condition
task type and one with the Modification task type).
- Select the Include Task? check box for all of them except the interval
maintenance for the Nose Landing Gear.
- Select the Simplified Work Order distribution type and the workshop
code nLAX-C.
- Save (F12).
- Select the Include Task? check box for the remaining task.
- Select the Work Order distribution type and the workshop code nLAX-C.
- Save (F12).
- The tasks will disappear from the Pending Tasks tab (and appear
in the Planned and Running Tasks tab).
- Click the Planned and Running tasks tab and verify that the
tasks have the Released status.
- Continue with exercise
Simplified Order Processing
- 1.
Purpose: The purpose of this lesson is to handle a fault
task which is to identify the reason for vibrations in the nose landing gear.
Prerequisites: Before starting on this exercise you must
have finished the
Faults and Events -1 exercise.
Windows:
Task Distribution
- Open the Task Distribution window.
- Query for the top serial number nX20000.
- Click the Pending Tasks tab and verify that there is one task
due with the Serial Repair task type.
- Select the Include Task? check box.
- Select the Simplified Work Order distribution type and the workshop
code nLAX-C
- Save (F12).
- Continue with exercise
Simplified Order Processing
- 2.
Purpose: The purpose of this lesson is to handle task being
generated because of Modification Inspection and Fault.
Prerequisites: Before starting on this exercise you must
have finished the
Operation Logging - 3 and
Faults and Events - 2 exercises.
Windows:
Task Distribution
Maintenance Order
- Open the Task Distribution window.
- Query for the top serial number nX20000.
- Click the Pending Tasks tab and verify that there are 2 tasks
due (one with the Serial Repair task type and one with the Modification
task type).
- Select the Include Task? check box for these two tasks.
- Select the Simplified Work Order distribution type and the workshop
code nLAX-C.
- Save (F12).
- Continue with exercise
Simplified Order Processing
- 3.
Purpose: The purpose of this lesson is to handle task being
generated because of interval due (A-check), modification inspection and post check
for the serial repair.
Prerequisites: Before starting on this exercise you must
have finished the
Operation Logging - 4 exercise.
Windows:
Task Distribution
Maintenance Order
- Open the Task Distribution window.
- Query for top serial number nX20000.
- Click the Pending Tasks tab and verify that there are 4 tasks
with due date passed (two with the Interval Maint task type, one with
the Modification task type and one with the PMC Serial Repair
task type).
- Select the Include Task? check box on 3 of the tasks (Interval
Maint for the A/C, Modification and PMC Serial Repair).
- Select the Simplified Work Order distribution type and your workshop
code nLAX-C.
- Save (F12).
- Select the Include Task? check box for the remaining task.
- Select the Work Order distribution type and the workshop code nLAX-C.
- Save (F12).
- Continue with exercise
Simplified Order Processing
- 4.
Purpose: The purpose of this lesson is to handle task being
generated because of interval due (A-check, Overhaul and Replacement) and modification
due (Wheel Axle modification/replacement).
Prerequisites: Before starting on this exercise you must
have finished the
Operation Logging - 6 exercise.
Windows:
Task Distribution
Maintenance Order
- Open the Task Distribution window.
- Query for top serial number nX20000.
- Click the Pending Tasks tab and verify that there are 5 tasks
with due date passed (four with the Interval Maint task type and one
with the Modification task type).
- Select the Include Task? check box all of the tasks.
- Select the Simplified Work Order distribution type and your workshop
code nLAX-C.
- Save (F12).
- Continue with exercise
Simplified Order Processing
- 5.
Purpose: The purpose of this lesson is to handle the generation
of a modification task which leads to a part identity change.
Prerequisites: Before starting on this exercise you must
have finished the
Modification Program leading to Part Identity Change exercise.
Windows:
Task Distribution
Maintenance Order
- Open the Task Distribution window.
- Query (F3) for the top part number X747-900 and top serial number nX30000.
- Click the Pending Tasks tab and verify that a modification
task with the task code nRENMOD, Modification task type and where the
Due Date is passed exists.
- Select the Include Task? check box for this modification task record.
- Select the Simplified Work Order distribution type and workshop code
nLAX-C.
- Save the record (F12).
- Continue with exercise
Simplified Order Processing
- 6.
Copying forbidden: The material in this manual is protected by copyright law, and may not be copied entirely or in part, without the prior permission of Industrial & Financial Systems AB. © 2012 Industrial & Financial Systems AB