Change Work Scope Tasks

[About Reconfigure Work Scope] [About Off Log] [About Expected Off Log] [About Expected On Log] [To Manage Line Maintenance] [To Scope Maintenance Visit] [To Define Work Scope] [To Execute Work Scope]

Usage

Use this window to reconfigure a running work scope. This is the work scope created for your overhaul object's (e.g., aircraft engine) shop visit. Once the interim order structure is released, all MRO work orders generated for VIM serials can be queried for in this window.

The work scope will retain information on the serials located in the overhaul object's structure. This includes the serials that were added to the structure at a later stage of the visit through a different part found scenario (DPF scenario).

Select the right mouse button option On Condition Modification - Report to open the report that will list all on-condition modifications that are missing in the work scope. On-Exposure, On-Repair and On-Scrap modifications for the overhauled object's structure are defined in the customer's modification baseline. The report will list the following if the modification is not yet included in the work scope:

For the description of each tab in the window, follow the appropriate link: LLPs, Modification, Affected Parts Update, Off Log, Superfluous Tasks, Map Serial Numbers, Expected Off Log, Expected On Log.

Activity Diagram

Plan Maintenance Tasks, Variant MRO
Handle Order Structure
Reserve and Issue Components
Perform Due Calculations 

Activities

Verify Off Log Structure
Evaluate and Add LLP Tasks to Work Scope
Evaluate and Add Modification Tasks to Work Scope
Remove Superfluous Tasks
Perform Due-calculation for LLP and Interval Maintenance Tasks
Perform Due-calculation for Modification Tasks