This activity is used to define the operation that is planned to utilize the material.
The work order operations must be defined prior to the registering of required material if the material should/must be connected to operations.
If IFS/CBS is used to schedule the operation the Required Date of the material requisition will be changed to that of the operation line when the status of the work order is changed to Prepared.
Report In
Work Order
Work Order Execution
Logic
Report In Work Order
Report
In Work Order/Material
Work Order Execution Logic
Work Order Execution Logic/Materials
Use the following procedure to connect to operation: