Master Scheduling Level 1 Part/Register Forecast

[About Master Production Schedule Level 1] [About Forecast]

[To Master Scheduling]

Usage

Use this tab to enter and maintain forecasts for Levels 0 and 1 and the master schedule. The forecast for Level 1 is controlled entirely on this level; you must update the value under this tab. The bottom line in the Register Forecast tab is a total of all forecasts and other columns in the window. For a total forecast of a master schedule set, select the forecasts that belong to that set. There are other considerations; see the About document for descriptions and explanations.

Activity Diagrams

Perform MS level 1

Activities

Update result from level 0
Enter master schedule level 1
Evaluate master scheduling level 1 result