DOP Header

[About Dynamic Order Processing] [About DOP Header] [About Performance Monitoring] [About Serial Numbers in DOP] [About DOP Events in Event Server]

[To Make to Order Planning]

Usage

Use this window and its tabs to process orders that use Dynamic Order Processing. In this window, you can study the DOP header, which can be created when a customer order is created for the DOP part. You can also create the DOP header manually. The part you enter on a DOP header must exist in the inventory part register. For additional information regarding dynamic order processing, check the corresponding About document, [About Dynamic Order Processing]. Only company-owned stock is allowed for DOP.

For the description of each tab in the window, follow the appropriate link: Detail, Structure, Structure Multilevel, Alarms, Demand, Tree Structure, Costing, Serial No Reservations, DOP Log, Performance Monitoring, GanttChart, Scheduling Analysis

Activity Diagrams

Create DOP header manually
Create DOP structure
Net DOP order/structure
Generate DOP alarm
Maintain DOP plan/orders
Release DOP order
Calculate and view DOP cost

Activities

Enter part information
Select not allocate
Select Allocate
Select no netting
Select netting
Select netting supply
Select structure depth full level
Select structure depth DOP part
Select no financial integration
Select create values
Create code part value
Select auto pre-posting
Select auto release
Select no auto release
Create top DOP order
Create complete structure from BOM
Copy complete structure from DOP
Create default structure from BOM
Reserve serial numbers for DOP
Create DOP structure manually
Remove DOP branch
Change DOP revision/alternative
Add DOP branch
Modify manually within DOP structure
Net branch
Net
Net (DOP Header)
Manual netting from inventory
Manual netting from other DOP orders
Manual netting from same DOP structure
Generate full structure alarm
Generate specific order alarm
Generate branch alarm
Peg customer order to DOP header
Unpeg customer order from DOP header
Create pegged order
Add default DOP routing
Change revision and/or alternative
Remove DOP routing
Change create pegged
Move DOP order
Propagate date upstream
Propagate date downstream
Propagate quantity upstream
Propagate quantity downstream
Update top level date
Update top level quantity
Release all (DOP Header)
Unpeg all
Finite schedule order
Show DOP cost variances
View performance monitoring
View configuration
Edit configuration
Create configuration
Create structure from interim order
Create structure from configuration evaluation
Copy complete structure from DOP with same configuration