Schedule Standalone Work Order
Change Work Order Status and Schedule Work Order
Usage
Use this dialog box to change the status of the
selected work order and thereby schedule it. This dialog box is only enabled for
work order sites that are CBS enabled. The following options can be selected
when rescheduling the work order.
- Allow Reassignment - Directs the scheduler
to reassign resources between work order operations during a scheduling run.
- As Late As Possible - The work order will
be scheduled as close as possible to its Requested Finish date.
- Refresh Materials - The information about
parts that constitute constraints will be refreshed from the database to
IFS/CBS prior to performing scheduling.
- Include Released Orders - Select this
option to also schedule work orders that have been released, i.e., are in
the Released status.
- Compress Downstream from Bottleneck -
Select this option if you want to keep the work order operations as close as
possible to the bottleneck resource.
Activity Diagrams
Schedule WO
with CBS
Activities
Set Work Order Status to Prepared