View Operations

Explanation

Use this function to display Operations per Work Center. This window includes data about the operations that create the workload for the site-shared work center depicted in the CRP load graph. 

Prerequisites

Before you can display Operations per Work Center, the following operations must have been completed in CRP Load per Work Center in All Sites:

System Effects

As a result of this activity, Operations per Work Center opens with a display of the operations to be performed in the shared-site work center depicted in the bar graph.

Window

CRP Load per Work Center in All Sites

Related Window Descriptions

CRP Load per Work Center in All Sites
CRP Load per Work Center Department
CRP Load per Production Line
CRP Load per Work Center

Procedure

  1. Populate CRP Load per Work Center in All Sites with data.
  2. In the list box, select a work center number.
  3. Specify a time span in the To Date and From Date fields.
  4. With the cursor in the upper section of the window, click the right mouse button, then select View Operations.
  5. To view the operations to be performed in another shared-site work center or time span, repopulate CRP Load per Work Center in All Sites, specify the new parameters, then click the right mouse button and select View Operations.