CRP Load per Work Center in All Sites

[About CRP Load Graphs]

[To Perform CRP] [To Make to Stock Planning] [To Make to Order Planning]

Usage

Use this window to view a CRP load graph for a work center that is shared by more than one site. The graph depicts the total workload for all of the sites to which you have access. You can choose to view the daily or weekly load. The line at the top of the graph displays either the work center's available capacity or its theoretical capacity, while the bars depict the actual CRP load for the color-coded workload source listed on the right side. Any bar that goes above the capacity line is an overload and is displayed in a corresponding overload color.

To view related information about this shared-site work center, right-click and then select the appropriate option. Based on the selected option you can view either the overview of the CRP load for the work center, the details of the operations performed on it, or the details of the shop order requisitions to be fulfilled in it.

Activity Diagrams

N/A

Activities

View overview
View operations
View requisitions
Calculate graph