CRP Load per Production Line

[About CRP Load Graphs]

[To Perform CRP] [To Make to Stock Planning] [To Make to Order Planning]

Usage

Use this window to view a CRP load graph for a particular production line located in a single site during a specified date range. You can choose to view the daily or the accumulated weekly workload. If the line has more than one work center, the total load for all its work centers is displayed. The line at the top of the graph displays either the line's available capacity or its theoretical capacity, while the bars depict the actual CRP load for the color-coded workload source listed on the right side. Any bar that goes over the capacity line displays an overload and appears in a corresponding overload color.

To view related information about this production line, right-click and then select the appropriate option. Accordingly you can view: the overview of the CRP load for each work center in the line, the details of the operations performed on each work center, and the details of the shop order requisitions to be fulfilled in each work center.

Activity Diagrams

N/A

Activities

View overview
View operations
View requisitions
Calculate graph