Calculate Graph
Explanation
Use this operation to generate a bar graph that depicts daily or
weekly workloads for the selected work line. By default, the system calculates the daily loads. To display weekly
loads, select the Weekly check box. Changing the status of this check box makes
the graph update automatically.
Prerequisites
Before displaying the graph, the following operations must have
been completed in CRP Load per Production Line:
- The window must be populated with data.
- A production line must be selected in the list box.
- A time span must be specified in the From Date and To Date fields.
- If weekly information is desired, the Weekly check box
must be selected.
System Effects
As a result of this activity, a two-dimensional bar graph is
calculated and displayed.
Window
CRP Load per Production Line
Related Window Descriptions
CRP Load per
Production Line
CRP Load per Work Center in All Sites
CRP Load per
Work Center Department
CRP
Load per Work Center
Procedure
- Populate CRP Load per Production Line
with data.
- In the list box, select a production line.
- Specify a time span in the From Date and To Date fields.
- With the cursor in the upper section of the window, click the
right mouse button, then select Calculate Graph.
- If weekly information is desired, select the Weekly check
box. This can be done before or after step 3.
- To calculate the CRP load for another work cell or time span,
repopulate the window and specify the new parameters. The system automatically
recalculates the graph.