Calculate Graph

Explanation

Use this operation to generate a bar graph that depicts daily or weekly workloads for the selected work line. By default, the system calculates the daily loads. To display weekly loads, select the Weekly check box. Changing the status of this check box makes the graph update automatically. 

Prerequisites

Before displaying the graph, the following operations must have been completed in CRP Load per Production Line:

System Effects

As a result of this activity, a two-dimensional bar graph is calculated and displayed.

Window

CRP Load per Production Line

Related Window Descriptions

CRP Load per Production Line
CRP Load per Work Center in All Sites
CRP Load per Work Center Department
CRP Load per Work Center

Procedure

  1. Populate CRP Load per Production Line with data.
  2. In the list box, select a production line.
  3. Specify a time span in the From Date and To Date fields.
  4. With the cursor in the upper section of the window, click the right mouse button, then select Calculate Graph.
  5. If weekly information is desired, select the Weekly check box. This can be done before or after step 3.
  6. To calculate the CRP load for another work cell or time span, repopulate the window and specify the new parameters. The system automatically recalculates the graph.