View Operations

Explanation

Use this function to display Operations per Work Center. This window includes data about the operations that create the workload for each work center in the production line depicted in the CRP load graph.

Prerequisites

Before you can display Operations per Work Center, the following operations must have been completed in CRP Load per Production Line:

System Effects

As a result of this activity, Operations per Work Center opens with a display of all operations to be performed in each work center in the production line depicted in the bar graph.

Window

CRP Load per Production Line

Related Window Descriptions

CRP Load per Production Line
CRP Load per Work Center in All Sites
CRP Load per Work Center Department
CRP Load per Work Center

Procedure

  1. Populate CRP Load per Production Line with data.
  2. In the list box, select a production line.
  3. Specify a time span in the From Date and To Date fields.
  4. With the cursor in the upper section of the window, click the right mouse button, then select View Operations.
  5. To view the operations to be performed in another work cell or time span, repopulate CRP Load per Production Line, specify the new parameters, then click the right mouse button and select View Operations.