View Operations
Explanation
Use this function to display
Operations per Work Center. This window includes data about the operations that create the
workload for each work center in the production line depicted in the CRP load graph.
Prerequisites
Before you can display Operations per Work Center, the following operations must have been completed in
CRP Load per Production Line:
- The window must be populated with data.
- A production line must be selected in the list box.
- A time span must be specified in the From Date and To Date fields.
System Effects
As a result of this activity,
Operations per Work Center opens with a display of all operations to be performed in each
work center in the production line depicted in the bar graph.
Window
CRP Load per Production Line
Related Window Descriptions
CRP Load per
Production Line
CRP Load per Work Center in All Sites
CRP Load per
Work Center Department
CRP
Load per Work Center
Procedure
- Populate CRP Load per Production Line
with data.
- In the list box, select a production line.
- Specify a time span in the From Date and To Date fields.
- With the cursor in the upper section of the window, click the
right mouse button, then select View Operations.
- To view the operations to be performed in another work cell or
time span, repopulate
CRP Load per Production Line,
specify the new parameters, then click the right mouse button and select View
Operations.