View Overview

Explanation

Use this function to display CRP Workload per Work Centers. This window contains a table that displays detailed CRP load information for each work center in the production line depicted in the CRP load graph.

Prerequisites

Before you can display CRP Workload per Work Centers, the following operations must have been completed in CRP Load per Production Line:

System Effects

As a result of this activity, CRP Workload per Work Centerrsopens with a display of the CRP workload to be performed in each work center in the production line depicted in the bar graph.

Window

CRP Load per Production Line

Related Window Descriptions

CRP Load per Production Line
CRP Load per Work Center in All Sites
CRP Load per Work Center Department
CRP Load per Work Center

Procedure

  1. Populate CRP Load per Production Line with data.
  2. In the list box, select a production line.
  3. Specify a time span in the From Date and To Date fields.
  4. With the cursor in the upper section of the window, click the right mouse button, then select View Overview.
  5. To display an overview of the CRP workloads for another work cell or time span, repopulate CRP Load per Production Line, specify the new parameters, then click the right mouse button and select View Overview.