View Operations
Explanation
Use this function to display
Operations per Work Center. This window includes data about the operations that create the
workload for each work center in the department depicted in the CRP load graph.
Prerequisites
Before you can display Operations per Work Center, the following operations must have been completed in
CRP Load per Work Center Department:
- The window must be populated with data.
- A department number must be selected in the list box.
- A time span must be specified in the From Date and To Date fields.
System Effects
As a result of this activity,
Operations per Work Center opens with a display of the operations to be performed in each
work center in the department depicted in the bar graph.
Window
CRP Load per Work Center Department
Related Window Descriptions
CRP Load per
Work Center Department
CRP Load per
Work Center in All Sites
CRP Load
per Production Line
CRP Load per
Work Center
Procedure
- Populate CRP Load per Work Center Departmentwith
data.
- In the list box, select a department number.
- A time span must be selected in the From Date and To Date fields.
- With the cursor in the upper section of the window, click the
right mouse button, then select View Operations.
- To view the operations to be performed in another department or
time span, repopulate
CRP Load per Work Center Department,
specify the new parameters, then click the right mouse button and select View
Operations.