Recalculate Period Template
Explanation
Use this activity to recalculate the period template
that is selected in the PMRP Material Plan Graph
window.
Prerequisites
This activity requires an inventory (PMRP)
part, along with a period template.
System Effects
As a result of this activity, the system recalculates
the selected period template's begin date to match the date you have specified
in the
Recalculate Period Template dialog box.
Window
PMRP Material Plan Graph
Related Window Descriptions
PMRP Material Plan
Graph
Recalculate Period Template
PMRP
Graph Parameters
Procedure
-
In the PMRP Material Plan Graph
window, specify the inventory (PMRP) part number, site, and period template
ID.
-
Right-click and then click
Recalculate Period Template. The
Recalculate Period Template
dialog box opens with the period template's last recalculation date
displayed in the Period 1 Begin Date field.
-
Enter the date that you want to use in place of the
default value in the Period 1 Begin Date field.
-
Click
OK to recalculate the period template.
It will use the date that you entered as the period template's begin date.