PMRP Graph Parameters

[To Perform PMRP]

Usage

Use this dialog box to generate the detailed material plan (PMRP) graph. You can enter the period range for which you want to generate the plan. 

Note:When you type a new period number in the Begin Period No field, the Range Begin Date field displays the first date for that period. Likewise, when you enter a new period number in the End Period No field, the Range End Date displays the concluding date for that period number. The default value for the beginning period is based on the period template recalculation date of the template ID, specified in the PMRP Material Plan Graph window. The default value for the ending period number is based on the site date  in the window. If the recalculation date falls before the first period number, the period 0 (zero) is used. The period number 0 (zero) indicates that the system will consider all previous supply and demands that are due when plotting the graph.If the site date or the recalculation date falls outside the maximum period number, the maximum period number will be used. When the dialog box is first opened, the site date and the recalculation date appear in the Period End Date and Period Begin Date fields.

Activity Diagrams

Perform PMRP

Activities

Show graph
Select PMRP graph parameters
Recalculate template