View Operations
Explanation
Use this function to display
Operations per Work Center. This window includes data about the operations that create the
workload for the work center depicted in the CRP load graph.
Prerequisites
Before you can display Operations per Work Center, the following operations must have been completed in
CRP Load per Work Center:
- The window must be populated with data.
- A work center number must be selected in the list box.
- A time span must be specified in the From Date and To Date fields.
System Effects
As a result of this activity,
Operations per Work Center opens with a display of the operations to be performed in the
work center depicted in the bar graph.
Window
CRP Load per Work Center
Related Window Descriptions
CRP Load per
Work Center
CRP Load per Work Center in All Sites
CRP Load per
Work Center Department
CRP Load per
Production Line
Procedure
- Populate CRP Load per Work Centerwith
data.
- In the list box, select a work center number.
- Specify a time span in the From Date and To Date fields.
- With the cursor in the upper section of the window, click the
right mouse button, then select View Operations.
- To view the operations to be performed in another work center or
time span, repopulate
CRP Load per Work Center, specify
the new parameter, then click the right mouse button and select View Operations.