Study PMRP Part Information
Explanation
This activity is used to study information about the planned receipts/deliveries and
the gross demand for parts. You can view information about:
-
Expected
receipts and deliveries of the part.
-
Existing
material/gross requirements.
-
Planned
and proposed receipts from project material requirements planning (PMRP).
-
Material transfer requisitions (MTR) created by multi-project requirements
planning (MPMRP).
-
Gross
requirements for the part calculated by PMRP (the requirements for PMRP considers only receipts
and deliveries, not the quantity on hand).
-
The shop
order that generated the demand; if the part is a component, the parent
part is displayed.
-
Material Transfer Requisitions (MTR) in the status
Planned,
Released or
Partially Approved and which does not have a valid source to supply. The
Exclude check box will be selected to indicate these records that were
excluded from the PMRP calculation. This will be valid for MTR's with the
supply type Inventory.
The result of the latest PMRP calculation will be
displayed in the PMRP Part Information window. The calculation
result will be presented per part, site, and project activity. As a result
of the part transfer by MTR, if a supply or demand exists, it will be shown on
the
Receipts and Deliveries tab.
Prerequisites
- The material requirements calculation must have been performed for the part.
System Effects
N/A
Window
PMRP Part Information
Related Window Descriptions
PMRP Part Information
PMRP Part
Information/Details
PMRP
Part Information/Receipts
and Deliveries
PMRP Part
Information/Gross Requirements
PMRP Part Information/Pegged
Supply
PMRP Part Information/Created MTRs
Multilevel Structures
Inventory Part
Availability Planning
PMRP Material
Plan Graph
Procedure
- Open the
PMRP Part Information window and query for
the part for which you want to study the specified information.
- Click the
Details tab to view detailed information
regarding the selected part.
- Click
the
Receipts and Deliveries tab to view expected
receipts and deliveries.
- Click
the
Gross Requirements tab to view gross
requirement for the part calculated by PMRP.
- Click the Gross Requirement By Template
tab to view the gross requirement for the part as per the given template.
Note: To open the
Multilevel Structures
window,
right-click in the header and then click Part Structure.
To open the
Inventory Part
Availability Planning window which shows the availability of the
selected part, right-click in the header and then click Inventory Part
Availability Planning.
To open the PMRP Material Plan window, right-click in the
header and then click View Material Plan.
Right-click in the header and then click
Material Plan Grapg to open
the
PMRP Material Plan Graph window.