Use this tab to enter additional information for failures and faults that have occurred during the maintenance of a serial.
You can define post-maintenance checks for a fault (creates post-repair repetitive checks) when the fault is repaired. These checks are based on the given intervals (both operational and calendar) for the fault. Each post-maintenance check is created as a pending task when the planned task date of the check is within the given number of days forewarning. Only one check per fault can be pending or running at a particular time.
In this tab you can also defer a fault. To defer a fault, select a deferral list, an operational value, and/or a number of days. When recalculation is authorized, the task date is updated according to the selected operational value.
Make
Operational Entry
Maintenance Visit Induction
Integrate
Emergent Work
Test and
Acceptance
Report a Fault
Recalculate Deferral
Enable Fault Deferral
Disable Fault
Deferral
Approve Fault
Deferral
Enable Post Maintenance Check
for Fault