Use this tab window to view the results after a resource capacity calculation. Load and capacity information is shown for each resource group and period. The most important results are: Load Hours, Normal Capacity, Maximum Capacity and Utilization.
Plan and Assign Resources
Plan Resource Capacity Resource Capacity Summary Graph