Project Item/Consist Of

[About Project Product Structure] [About Part Ownership] [About Project Inventory] [To Design Project Delivery Product] [To Assemble And Test Project Delivery Product]

Usage

Use this tab window to view the first level of the structure of the specific project item. The structure can be modified by using some of the available menu options in the tab window.

If the parent is in status Realized, the new item must have been created in Project Product/Items tab and set to status Realized status before it can be connected into the realized item’s structure. Status changes for the subpart can be done from the menu.

You can transfer a list of parts to Project Item window by right-clicking and then clicking Project Item or to Engineering Part Revision window by right-clicking and then clicking Engineering Part Revision. Other  options available to go directly to relevant window are Inventory Part, Inventory Availability Planning, Purchase Part, Product Structure, Part and Best Fit Search.

Using the menu option View All Parents, you can view all parts where the current project item is a member in the structure, and transfer to new instance of the Project Item window. All parts or project items that have current part as a child part will then be available in the combo box.

Activities in this tab window can also be performed in Project Item Navigator/Consist Of tab.

Activity Diagrams

Create And Maintain Project Product Structure
Handle Project Delivery Changes
Approve Project Product Structure
Define/Redefine Serial Numbers
Analyze Test Results
Complete Project Product Structure Information
Prepare Assembly

Activities

          Enter Project Item
         
Build Project Delivery Structure
          Delete Project Delivery Structure Branch
          Change Project Product
          Copy Standard Structure
          Copy Project Item Structure
          Replace Serial
          Reserve Serial Number
          Unreserve Serial Number
          Set Serial Number
          Reset Serial Number
          Approve Project Product Design
          Set Project Product Structure Realized
          Redefine Project Item
          Redesign Project Item
          Reserve Inventory to Project
          Issue from Inventory to Project Delivery
          Unissue to Inventory from Project
          Print Pick List
          Change Inventory Part Location