Use this window to view information related to the entire project structure. The project must have been selected or queried first before the graphical display and tab container are shown.
The structure for the selected project is presented graphically in a box in the left-hand part of the window, where it remains until either a new project is chosen or the Project combo box is cleared. It is possible to navigate between all subprojects and activities in the graphical project structure, and to resize the graphical display by dragging on the splitter to left or right.
To move items in the graphical
display, the drag and drop method can be used, or simply
cut and paste.
The top node (root) is also called the project node. When moving items, keep
in mind that:
The Tab Container on the left-hand part of the Project Navigator window contains the tabs necessary to insert or modify or display data related to the items in the graphical display. As the user selects different type of items in the graphical display, different tabs are shown. The tabs shown are selected based on the following three types of items; Project (root node), Sub Project, Activity.
Selected Item Type | Tabs enabled for the selected node type |
Project (Root Node) | Gantt, Sub Project, Project Access, Resource, Analysis, Summary, History, Planning, Project Documents |
Sub Project | Gantt, Sub Project, Project Access, Activity List, Activity, Resource, Tasks, Analysis, Summary, History, Planning, Project Documents |
Activity | Gantt, Activity, Resource, Tasks, Connections, Analysis, Demand, Supply, History, Planning, Project Documents |
For the description of each tab in the window,
follow the appropriate link:
Project, Gantt,
Sub Project,
Activity
List, Activity,
Resource,
Role Assignments,
Tasks,
Connections,
Analysis,
Demand,
Supply,
History,
Planning,
Access, Document
Transmittals and
Documents.
If IFS/Project Reporting is used together with IFS/Project, the following
tabs will also be available: Activity Hours, Valid Report Codes.
If IFS/Preventive and Corrective Maintenance is used together with IFS/Project, the tab
Work Orders
will also be available.
Establish Project Plan
Define
Project Deliverables and Plan Project Revenue
Plan and Assign Resources
Approve Project
Execute Activity
Release
Activity
Analyze
Project Performance
Complete Project
Close Project
Restart Project
Change Project Product Info
Reorganize Project Structure
Connect Document To Project
Copy Project Plan
Delete Sub Project Structure
Approve Project
Release
Activity
Start Project
Restart Project
Complete Project
Cancel Project
Set Baseline
Copy Activity
Delete Activity
Cancel Activity
Replan Activity
Complete
Activity
Close Activity
Reopen Activity
Report Cost/Hours/Revenue and Progress on Activity Objects
Print
Project Pick List
Enter
Pre-Postings, Project Demand
Enter Role
Assignments