Use this tab window to identify the items in your
delivery project. All items to be used in your project product structure are entered here, including the top item. You can also insert new items into
the project in Project Item/Project Item tab or in Project Item/Consist Of tab. Project item statuses are
Defined, Designed
and Realized.
Some menu options are available for the project item to go directly to some
windows or forms. These menu options are Project Item, Inventory Part, Inventory
Availability Planning, Purchase Part, Profuct Structure, Engineering Part Revision, Part and Best Fit Search.
Create
And Maintain Project Product Structure
Approve
Project Product Structure
Analyze
Test Results
Define/Redefine
Serial Numbers
Prepare
Assembly
Complete
Project Product Structure Information
Plan
Project Material Demand
Enter
Project Item
Connect Requirement Activity
Connect Document To Serial
Copy
Standard Structure
Copy Project Item Structure
Reserve Serial Number
Unreserve Serial Number
Set Serial Number
Reset Serial Number
Approve Project Product Design
Set Project Product Structure Realized
Redefine Project Item
Redesign Project Item
Update Project Material Cost From PQL
Transfer Part to Inventory
Reserve
Inventory to Project
Issue from Inventory to Project Delivery
Unissue to Inventory from Project
View Project Delivery Structure Graphically
Delete Project Delivery Structure Branch
Print Pick List
Define Supply Option
Change Inventory Part Location